Maximum offer calculator (UK MAO)

The most you can offer a seller and still leave your end buyer the return they need — worked backwards from the finished value, not from the American 70% rule.

Your numbers

What it sells for done up. The single figure everything else hangs off.

This comes out of the offer, not out of thin air.

Profit the end buyer wants on the finished value. 20% is the usual UK floor.

months

Scotland and Wales levy different taxes, and we do not guess at them.

Nothing here is sent anywhere. The whole calculation runs in this browser, on the same engine the app uses.

Maximum offer
£101,600
51% of the finished value

You can offer up to £101,600 — that is 51% of what it is worth done up, after a buyer's 20% return, the refurbishment, stamp duty and the costs of buying. Your £5,000 fee is already taken out.

Value once refurbishedYOU
£200,000
Buyer's profitASM
20% of the finished value
£40,000
RefurbishmentYOU
£35,000
Selling costsASM
£5,000
Holding costsASM
6 months
£4,800
Stamp dutyVER
£5,333
Legal and surveyASM
£3,200
Most a buyer could payEST
£106,667
Your feeYOU
£5,000
Maximum offerEST
51% of the finished value
£101,600
What this assumes
  • End buyer wants 20% profit on the finished value.
  • Selling costs 2.5% of resale value.
  • Acquisition costs 3.0% plus transfer tax.
  • Held for 6 months.
  • Offers rounded down to the nearest £100.

This is one sum out of a whole deal

Inside the app the same engines run against real HM Land Registry sold prices, rank your buyers against the deal, and tell you what to do next — with the workings attached to every figure, exactly as they are here.

The demo runs on invented deals and real postcodes. No account, nothing saved.

Questions

Why not the 70% rule?

Because it is American. The 70% rule bakes in American transaction costs and a stamp duty that does not exist there. This solves the question the buyer is actually asking — what is the most I can pay and still make my return — and the percentage falls out of the answer rather than being assumed at the start.

What does 'buyer's required return' mean?

The profit your end buyer wants for doing the project, as a share of the finished value. If you set it too low, your deal will not sell however good the paperwork is.

It says no offer works. Have I done something wrong?

Probably not. Once the buyer's profit, the refurbishment and the cost of buying come out, most properties leave nothing for a fee. That is the normal result, and a tool that hid it would cost you money.